Bored piers
After piers are formed, before concreting
Pier size and depth, cage positioning, clearance to sides, reinforcement details, concrete pour area access
Learn more about the bored piers inspection →Seven visits through a Morayfield build, each timed before the next trade hides the work.
One of our inspectors will call you back.
If it is urgent, email [email protected]
Fully licensed & accredited
Queensland Building & Construction Commission
Australian Society of Building Consultants
Strata Community Association
Building Dispute Practitioners Society On Morayfield slabs we keep recording the same three things: steel too close to the form, mesh left sagging between chairs, and steps in the slab with no reinforcement extended past them. Inspectors check structural timbers in new builds. They look for steel connections that do not match drawings. They check joist hangers fit the timber correctly. They also look for double beams that are not uniform. Lock-up stage checks ensure safety. Inspectors verify that gas lines and cables do not touch hot water pipes or steel. We will inspect the work as it happens so issues can be fixed before the next stage.

After piers are formed, before concreting
Pier size and depth, cage positioning, clearance to sides, reinforcement details, concrete pour area access
Learn more about the bored piers inspection →
The day before the pour, after reo is set
Mesh size and spacing, slab thickness, vapour barrier continuity, edge strip depth, penetrations through the slab
Learn more about the slab pre-pour inspection →
Frame and trusses standing, roof on, before linings
Connections to the slab, wall bracing, double beams, bottom plates, ties and straps, structural timber
Learn more about the frame inspection →
Cladding on, windows in, before plaster
Flashings and weep holes, cable clearances, ducting, water and gas pipes off steel, wall ties
Learn more about the lock-up (pre-plaster) inspection →
Joinery and doors in, before painting
Balcony drains, waterproof puddle flanges, shower pan levels, control joints, penetration seals
Learn more about the fixing inspection →
Membrane set, before the tiler starts
Torn membrane, flange height, upturns, transitions, drainage connections, damage around penetrations
Learn more about the waterproofing inspection →
Pre-handover inspection checklist
Facade joints and cavities, balcony drainage and tiles, window restrictors, capping and falls, cladding clearances
Learn more about the pre-handover (PCI) inspection →One finding from each stage, recorded on homes being built in Morayfield.
Bored piers
Slab
Frame
Lock-up
Fixing
Waterproofing
Handover

20 October 2026 · 3 min read
Steel bars must match the approved drawings and the relevant standards.

1 October 2026 · 3 min read
Morayfield homes show specific defects due to the local soil and climate, as well as the age of the housing stock.

12 September 2026 · 3 min read
Services crowded together inside a wall are the most common lock-up item we record in Morayfield.
Pre-Handover (PCI) Inspections A full report on your Morayfield build, ready before you sign the final papers.
Building and Pest Inspections Building and timber pest reports from a single Morayfield visit.
Pre-Purchase Building Inspections A visual AS 4349.1 inspection for established Morayfield homes.
Insurance Building Reports Independent evidence of what damaged your Morayfield home, for a claim or a refusal.
Defect Investigation Reports We compare the build against the approved drawings, the NCC, engineering and the QBCC Standards and Tolerances Guide.
Dilapidation Reports Check the slab, framing and waterproofing before you lock in the handover inspection.
QCAT Expert Witness Reports Prepare for a dispute at QCAT with reports that meet the Queensland Building and Construction Commission Act 1991 standards.
Pre-Sale Inspections Identify defects before the final inspection so you do not have to pay for rectification. Instant online pricing for Morayfield, or contact the booking team.
A slab stage inspection looks at the concrete base, while a frame stage checks the timber or steel structure before the roof goes on.
A dropped slab level usually requires extra reinforcement set in a specific distance from the edge. We have recorded them missing on Morayfield pours, which the engineer then has to review.
Standard Queensland residential contracts allow you to engage your own consultant. Let us know when you need us and we work around your contractors.