Morayfield Building
Inspections

Waterproofing inspection in Morayfield

The waterproofing in your wet areas, checked during the short gap before tiling.

  • Membrane set, before the tiler starts
  • About 1 hour on site
  • Report within 24 hours
Get a quoteWe’ll send a quote to your inbox once we have your details

No obligation. We use your details for your quote and may contact you about it even if you don't finish.

Fully licensed & accredited

Stage6 of 7
When to bookMembrane set, before the tiler starts
Time on siteAbout 1 hour on site
Inspected againstAS 3740 (waterproofing of domestic wet areas), AS 3958 (tiling), NCC Volume Two Part 10.2

What is included in a Morayfield waterproofing inspection

  • Membrane continuous across the shower floor
  • Puddle flange level with the screed
  • Flange discharging into the drain
  • Wall height meets building standards
  • Corner junctions treated
  • Penetrations sealed at the membrane
  • Laundry and bath floor wastes
  • Balcony waterproofing joints
  • Bond breaker at floor-to-wall joints
  • Tile adhesive bond area clean
  • Cure time before tiling
  • Waterproofing patches taped
Why it matters here

Waterproofing inspections on Morayfield builds

Our Morayfield waterproofing reports often find membrane damage, shower floor pinholes, a laundry floor drain without a puddle flange and upturns too short at junctions. These faults need fixing on a bare membrane before tile adhesive is applied.

What we find at this stage in Morayfield

  • Broken waterproofing before tiling
  • Shower floor pinhole leaks
  • Drain flange missing at floor level
  • Flanges at incorrect heights
  • Faults near road intersections
Incomplete, recorded during a waterproofing inspection in Holland Park
Waterproofing on the balcony was incomplete and needs to meet national standards to protect the structure, Holland Park
Sample findings

Sample defects found during our waterproofing inspections in Morayfield

Annotated findings from Waterproofing inspections.

Additional coat required, recorded during a waterproofing inspection in Gleneagle
The waterproofing membrane was applied improperly and needs an extra coat to cover, Gleneagle
Damaged waterproofing, recorded during a waterproofing inspection in Cleveland
The waterproofing membrane is damaged and needs fixing before tiling, Cleveland
Damaged wall/waterproofing, recorded during a waterproofing inspection in Cleveland
Waterproofing behind the vanity was damaged and needs repair, Cleveland
Waterstop angle required under doors, recorded during a waterproofing inspection in Benowa
Waterproofing must extend under the door to meet the Australian Standard for domestic wet areas, Benowa

The other stages of a Morayfield build

  1. Bored piers inspection in Morayfield1Bored piersAfter piers are formed, before concreting
  2. Slab pre-pour inspection in Morayfield2Slab pre-pourThe day before the pour, after reo is set
  3. Frame inspection in Morayfield3FrameFrame and trusses standing, roof on, before linings
  4. Lock-up (pre-plaster) inspection in Morayfield4Lock-up (pre-plaster)Cladding on, windows in, before plaster
  5. Fixing inspection in Morayfield5FixingJoinery and doors in, before painting
  6. Pre-handover (PCI) inspection in Morayfield7Pre-handover (PCI)Pre-handover inspection checklist

All construction stage inspections in Morayfield →

Guides

Construction stage guides for Morayfield

All guides →

Book a waterproofing inspection in Morayfield

Instant online pricing for Morayfield, or contact the booking team.

FAQ

Waterproofing inspections in Morayfield: common questions

Which Australian Standard governs a Morayfield bathroom membrane?

We check wet areas against the National Construction Code and AS 3740.

How long to get the report?

The membrane needs to dry completely before tilers lay the tiles. Start looking for a builder inspection as soon as you schedule your waterproofing work.

Are your balconies covered?

We check roof cladding and membrane surfaces.

How does a puddle flange work?

A floor waste fitting that has a flange to allow the drainage pipe to connect. Water tracking under tiles can cause serious damage.

Is pinhole damage repairable?

Timber pests are often hidden under flooring, so checking the subfloor before laying tiles is important.

Is the inspection quick?

Allow roughly an hour on a typical Morayfield house.

Get a Free Quote